Education

  • Hammond Academy

    Hammond Academy

    Client:Hammond Academy, Hemel Hempstead, Hertfordshire

    Value:384k

    Project Description:
    Amber were Principal Contractor with CDM responsibility for the works to improve the facilities and operation of the school which was completed ahead of programme in just 14 weeks to the delight of the school management team and pupils.

  • beckton

    Beckton Library

    Client:London Borough of Newham

    Value:£350k

    Project Description:
    As part of Newham's regeneration program we carried out internal refurbishment and structural alteration works during this 16 week project. Elements of work included automated door system, data communications including information pods, updating of fire alarm and cctv systems, new suspended ceiling, flooring and decoration.

  • Hampton Roof

    Hampton & Hampton Wick School

    Client:London Borough of Richmond

    Value:£230k

    Project Description:
    The schools had both been experiencing water ingress problems. The renewal works included new Tapered Insulation Schemes to improve drainage and Modular Rooflights which increased natural light and reduced heat loss.

  • crofton

    Crofton Junior School

    Client:London Borough of Bromley

    Value:£560k

    Project Description:
    This project was carried out to provide space for Staff and Kitchen facilities. Within the Modular Building a new Staff Room was formed. Extra room was also created for upgrading works for the Kitchen equipment.

  • Holy Ghost

    Holy Ghost Primary School

    Client:Holy Ghost School Governors

    Value:£225k

    Project Description:
    The design & build of a new arts building within the existing school boundaries to include an external fully covered play area for the children. The construction consisted of a rear single story Arts Facility and Staff Office fronted by a two storey towered elevation incorporating a secure reception area, disabled persons facilities, kitchen and two store areas at first floor level and an external covered play area.

  • elizabeth selby roof

    Elizabeth Selby School

    Client:London Borough of Tower Hamlets

    Value:£570k

    Project Description:
    This contract was procured under the LHC arrangement to carry out an extensive internal and external refurbishment programme including partial redesign of classroom layouts. This was a challenging project as all internal works were to be completed within the 6 week summer holiday with only a minor scope of works. The remainder of the roofing works were carried out with the school in full occupation.